BUS 430 WEEK 9 QUIZ 8
BUS 430
Week 9 Quiz 8
TRUE/FALSE
1. Scheduling refers to determining the order in which jobs or tasks are
processed.
2. Telling an umpire crew to work
baseball games in Chicago, then Milwaukee, and then Cleveland is an example of
a sequence.
3. Scheduling and sequencing methods
used in manufacturing are more beneficial in low-contact, than high-contact,
service processes.
4. Scheduling problems occur almost
exclusively in manufacturing.
5. Appointments can be viewed as a
reservation of service time and capacity.
MULTIPLE CHOICE
1. Triage by nurses in an emergency room would be an example of
2. Scheduling refers to specifying
3. Staff scheduling needs all of the
following except
4. Which of the following is not a consideration when designing an
appointment system?
5. The time needed to process a given
set of jobs is called
SHORT ANSWER
1. Differentiate between scheduling and sequencing.
2. Staff scheduling attempts to match
available personnel with the needs of the organization by performing what four
steps?
3. What four (4) decisions are
considered in designing an appointment system?
4. Compare and contrast the advantages
and disadvantages of the Shortest Processing Time (SPT) and the Earliest Due
Date (EDD) sequencing rules.
5. Explain why any sequence chosen in
the single-machine scheduling problem will not change makespan time.
PROBLEM
1. The following five jobs, along with their processing time and due dates, are
given below.
2. The table below includes processing
times and due dates for five jobs.
3. A new surgical facility called Cut
& Sew is opening in neighborhoods throughout the United States. They are
job shops that handle a variety of outpatient surgical procedures. Their
process is set up so that one doctor cuts and the other sews. They have five
patients to sequence for tomorrow. Since the weather forecast is for a cool and
sunny day, they would also like to play golf tomorrow. They want to sequence
their patients with the objective of minimizing the time from the beginning of
the first job until the finish of that job. The patients and estimated times are
as follows:
4. A restaurant needs the following
number of wait staff to serve its evening guests.
5. A movie theater requires the
following minimum number of employees, each of which is required to have two
consecutive days off.